
Khazaen SME.
Space for
your next move.
An industrial and logistics community in Khazaen, designed around flexible space and the connections that help businesses grow.

One address.
Room to adapt.
The RASA SME development sits within Khazaen Economic City in Barka, Oman. Its 27,000 m² site accommodates 16 warehouses, each offering 1,000 m² and the option to divide into two 500 m² units.
Built around your operation.
Select a full warehouse or a smaller unit to match the scale of your business. Industrial and logistics uses sit at the heart of the development.
- Industrial activityProduction, assembly and workshops, subject to activity approval.
- Warehousing & logisticsStorage and distribution space for your supply chain.
- SME operationsA flexible unit size for businesses establishing or expanding in Oman.
The bigger picture.
Every unit, in detail.
Explore the architectural site layout, then find the location drawing for each of the 16 warehouses. View the original unit PDFs or download the complete collection.
OPEN FULL PLANA connected layout.
A defined location.
The masterplan shows the arrangement of industrial blocks, circulation routes, parking and shared service areas.
- Total plot
- 27,000 m²
- Development layout
- 8 blocks
- Warehouse halls
- 16 × 1,000 m²
Floor plans, sections & elevations 4 DRAWINGS
Architectural planning set · site masterplan, section, floor plans and elevations
DOWNLOAD 5 DRAWINGSArchitectural planning references from the August 2026 project package. They show the existing layout; structural details are being revised for the proposed ICF wall and K-SPAN roof system. Final dimensions, uses and specifications are subject to detailed design and approvals.
Find your warehouse.
Each drawing identifies one 1,000 m² warehouse by its paired unit numbers, from WH01–02 to WH31–32. Each hall can be divided into two nominal 500 m² units.
All 16 original unit drawings, in one PDF.16 pages · 1.6 MB · issued 11 October 2026
VIEW COMPLETE SETUnit drawings are provided for location identification. The allocation schedules show 1,000 m² warehouse area, 687.50 m² allocated common area and 6 parking spaces per warehouse. These are drawing allocations, not a live availability or booking status.
Space that works.
Details that matter.
The current engineering concept combines insulated reinforced walls with a curved K-SPAN roof, with office and service areas planned alongside the industrial space.
Insulated ICF walls
The revised concept uses a 150 mm reinforced-concrete core with 60 mm EPS insulation on each side.
K-SPAN roofing
Site-formed curved roofing using 1.5 mm DX51D galvanized steel coil, coordinated with the reinforced wall system.
Industrial floor
Reinforced industrial flooring with a power-float finish is included in the preliminary engineering scope.
Flexible block format
8 blocks of approximately 2,000 m², with an indicative block geometry of 58 m × 34.5 m.
Beyond the main hall.
Two modules form a nominal 1,000 m² warehouse. The dimensions below describe the preliminary module specification; individual unit layouts may vary.
- Loading & access
- Approximately 38 m² loading/service zone, with a motorized roller shutter approximately 5 m × 5 m.
- Office & service space
- Approximately 48 m² footprint per floor over two floors; about 96 m² gross ancillary area.
- Ground-floor facilities
- Workers’ rest room of approximately 24 m², two toilets including an accessible toilet, an electrical room and a steel stair.
- First-floor facilities
- Office of approximately 31 m², pantry and one toilet.
- Windows & finishes
- Double-glazed aluminium windows, ceramic flooring in office/service areas, and applicable plaster and paint finishes.
- Electrical provisions
- Basic lighting, ventilation connections, distribution and AC conduit/pipe provisions. AC units and industrial process wiring are excluded from the base scope.
- Fire protection
- Fire alarm in the preliminary unit scope and common fire-water infrastructure at site level. Internal sprinklers are excluded from the base unit scope; final fire-safety requirements remain subject to approval.
Based on the preliminary engineering brief dated 26 August 2026. The ICF + K-SPAN structural details are to be re-issued; dimensions and inclusions are indicative and subject to final engineering, authority approvals and the agreed unit specification.
Connected to
opportunity.
A location within Khazaen’s wider industrial and logistics ecosystem, with access to transport links, trade infrastructure and business services.
Tax & VAT provisions
Investment tax incentives may apply to eligible activities under Khazaen and Oman regulations. VAT treatment depends on the activity, transaction and applicable approvals.
Expressway connectivity
Access to the Muscat–Al Batinah Expressway and the main road network connects the city with customers, suppliers and regional trade routes.
Muscat & the airport
Located in Greater Muscat’s growth corridor, with Muscat International Airport approximately 50 km from Khazaen.
Sohar & Suwaiq ports
Road connections to Sohar Port, approximately 156 km away, and Suwaiq Port, approximately 52 km away, support regional cargo movement.
Silal produce market
Access to Silal Central Fruit & Vegetable Market within Khazaen connects businesses with the city’s produce trading and food distribution ecosystem.
Khazaen Dry Port
An inland logistics hub within the economic city, offering customs clearance, bonded storage and cargo consolidation services.
City infrastructure
Khazaen’s road network, electricity, water and fibre infrastructure provide a platform for industrial operations. Unit connections and capacities are confirmed by phase.
Investor support
Khazaen’s dedicated investor support and one-stop-shop services help businesses navigate establishment and licensing requirements.
International business
Khazaen advertises 100% foreign ownership of eligible projects, alongside access to Oman’s domestic market and regional road connections.
Tax incentives are assessed case by case. Any income-tax relief, VAT exemption, zero-rating or deferral requires the relevant legal conditions and authority confirmation. A location in Khazaen alone does not establish automatic eligibility. City facilities are shared services; specific unit services, charges and access arrangements are confirmed separately.
Official information & location references +
City-level information checked on 12 October 2026. Distances are indicative figures published by Khazaen, measured from the city rather than an individual unit.
Started with a plan.
Delivered in phases.
The project commenced on 1 October 2026. The anticipated delivery period is 10–12 months, depending on the execution phase. The handover date for each unit will be confirmed with its allocated phase.
EXECUTION SEQUENCE The stages below describe the programme; they do not indicate completion.
- 01
Design & approvals
Layout coordination, engineering and the approvals required for each execution package.
- 02
Site & infrastructure
Site preparation, access and the infrastructure works needed to support the development.
- 03
Warehouse construction
Foundations, structural works, roofing and the warehouse envelope, released in execution phases.
- 04
Services & completion
Building services, finishes, inspections and preparation for operational use.
- 05
Phased handover
Inspection and handover of completed units in line with the agreed phase and programme.
Every stage.
A clearer picture.
Follow the project through dated site photographs, organised by the work taking place. Open any published photo to view it at full size.
Project commencement
The development programme started on 1 October 2026.
0 published photos
The story, from the ground up.
Dated site photographs will document the work as it progresses. The first project photo update is awaiting publication.
Build your next
industrial move.
Looking for industrial space or a development partnership? Talk to our team about opportunities in Oman.


















